Final | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Jack Reynolds
|
|
|
Final Phone #: ###-#### Inspection requested via web by David Petsche - final ok
|
Mec-Aging Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Jack Reynolds
|
|
|
called and left Dave the HVAC contractor a message. Trying to find out if any progress has been made on job
|
Mec-Aging Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | | DONE |
Jack Reynolds
|
|
|
wip
|
Mec-Aging Inspection | 7/11/2018 | 7/11/2018 | 7/11/2018 | | DONE |
Jack Reynolds
|
|
|
called dave and he said the homeonwers are firefighters WIP
|
Mec-Aging Inspection | 4/11/2018 | 4/11/2018 | 4/11/2018 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Rough-in | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Chad Schwendiman
|
|
|
Bath fan and. Range hood exhaust Phone #: ###-#### Inspection requested via web by David Petsche
|
Mec-Aging Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | | PEND |
Brian Scoles
|
|
|
work in progress
|
Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PART |
Brian Scoles
|
|
|
Gas preasure test is in the garage The key to get in will be inside the little doggy door Call me when you get there Thanks Dave petsche Phone #: ###-#### Inspection requested via web by David Petsche- 20lb gas pass- ok to backfill gas line trench- need approved nail plates on csst per manufacturer- dryer vent and range hood need installed- mini split R/I ok
|