Final | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables
|
Final | 5/17/2017 | 5/18/2017 | 5/18/2017 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables- tile and mantel need installed per manufactures installation manual with combustible material- talked to Kevin at leisure time
|
Final | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ed Ables Inspection cancelled from web by: Ed Ables
|
Rough-in | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables
|
Pressure Test | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables- 20lb gas pass
|
Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Ables- need installation instructions onsite-
|
Pressure Test | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | FAIL |
Brian Scoles
|
|
|
gas test for range Phone #: ###-#### Inspection requested via web by Ed Ables- guage wont zero out
|