Final | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PASS |
Ben Livingston
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Pressure Test | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Ben Livingston
|
|
|
GAS/PVC/FIREPLACE Phone #: ###-#### Inspection requested via web by Oleg Chervak 20lb gas,5lb flue
|
Rough-in | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak fire place and rough in
|