Final | 8/22/2017 | 8/23/2017 | 8/23/2017 | A | PASS |
Brian Scoles
|
|
|
Call jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
Final | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | PART |
Brian Scoles
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- need to insulate filter box R/A on furnace
|
Rough-in | 6/2/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Brian Scoles
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- need to insulate supply plenum in crawl by final inspection- called contractor
|
Pressure Test | 6/2/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Brian Scoles
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- 20lb gas pass
|