Final | 3/30/2018 | 4/2/2018 | 4/2/2018 | A | PASS |
Brian Scoles
|
|
|
Final - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- firedamper angles ok- revised prints at GC office
|
Final | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PART |
Brian Scoles
|
|
|
Final - Call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- fire/smoke damper cleances ok- ok for angles- need to install one radiant damper- need air balance report- went over with Luke
|
Rough-in | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PART |
Brian Scoles
|
|
|
fire damper inspection - call luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- should have been conference on framing for fire/smoke dampers- went over with luke- all good on framing- ok to install dampers
|
Conference | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PART |
Brian Scoles
|
|
|
Luke ###-#### 9am to go through dampers.- went over every room in building 100, 200 and 300 checking for fire dampers, labels, access doors and routing- missing a few damper labels and access doors and sealing on duct- Luke will redline prints to be resubmitted with all new routings- will get copy of updated drawings from Acrh being submitted
|
Conference | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | DONE |
Troy James
|
|
|
Luke ###-#### 9am to go through dampers. Met brian and luke on site to discuss fire damper locations. Plans will be resubmitted to show changes.
|
Conference | 2/21/2018 | 2/22/2018 | 2/23/2018 | A | PART |
Bill VanDegrift
|
|
|
9am S/F damper conference ok
|
Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PART |
Brian Scoles
|
|
|
fire damper inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- went over fire/smoke damper locations with Bill V, Luke from TVR, Mike Jordan and GC- need to submit for new prints for locations of fire/smoke dampers to be deleted and show 4 only that need installed per our conference
|
Conference | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | CANC |
Bill VanDegrift
|
|
|
9am tomorrow
|
Final | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | PART |
Brian Scoles
|
|
|
Final - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- dryers ok- need to seal outside penetration water tight- need airbalance report onsite to final out
|
Final | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | PART |
Brian Scoles
|
|
|
final - call luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- builing 300 roof needs extension on plumbing vents with in 10 feet of outside air intake- fire damper labels in corridors need installed- dryers need installed and connected- temp occupancy ok- went over with Luke onsite
|
Rough-in | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PART |
Brian Scoles
|
|
|
2nd wrap of firewrap - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need to add couple more bands to fire wrap- need to insulate 4 makeup air duct at ceiling
|
Rough-in | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | PASS |
Brian Scoles
|
|
|
fire wrap inspection - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 1st layer fire wrap ok- ok for 2nd layer
|
Rough-in | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Brian Scoles
|
|
|
Light Test Inspection for AM - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- light test both ducts ok for 1st layer of insulation
|
Conference | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | CANC |
Brian Scoles
|
|
|
meet early as possible- 208 ###-####
|
Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PART |
Brian Scoles
|
|
|
AM Inspection: light test for grease duct - call luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need to fix pin holes and reinspect
|
Rough-in | 1/15/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Brian Scoles
|
|
|
Light Test - Grease Duct - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- reschedule for tomorrow am per phone call
|
Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Brian Scoles
|
|
|
cover inspection - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- bldg 300 ok for ceiling tiles to be installed- duct and flex all good
|
Rough-in | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Chad Schwendiman
|
|
|
Light test for grease duct - first thing in the am at our shop. 2925 South Cole Rd, Boise, ID 83709 Call Luke with questions Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Light test pass on 2 drops with a transition and 90 on the bottom about 4' long
|
Rough-in | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PART |
Alan Hauser
|
|
|
cover for building 200 - ok for tile
|
Rough-in | 9/28/2017 | 9/29/2017 | 9/29/2017 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PART |
Alan Hauser
|
|
|
duct seal inspection for building 300 - call luke Phone #: ###-#### duct seal good
|
Rough-in | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PART |
Alan Hauser
|
|
|
Rough in BLD 100 ok for cover
|
Conference | 8/11/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Alan Hauser
|
|
|
agreed need noncombustable wall behind hood
|
Rough-in | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PART |
Alan Hauser
|
|
|
Duct seal ok for center building
|
Rough-in | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PART |
Alan Hauser
|
|
|
bldg 200 all perimeter rooms ok for cover
|
Rough-in | 7/5/2017 | 7/6/2017 | 7/6/2017 | P | CANC |
Alan Hauser
|
|
|
Cover inspection for BLD 200 Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
Rough-in | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PART |
Alan Hauser
|
|
|
duct seal and fire dampers - BLD 200 ok
|
Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PART |
Alan Hauser
|
|
|
duct seal inspection for bld 200 -ok for insuolation for all outside rooms
|