Final | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Brian Scoles
|
|
|
Need a final inspection for Orange Theory for PM if possible for today the 12th thank you call Mike with any concerns. Phone #: ###-#### Inspection requested via web by Karl Hestekin
|
Final | 9/6/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Brian Scoles
|
|
|
Final Inspection Needed For Orange Theory PM If Any Questions Call Karl ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- ok to install ceiling tiles- need other mech contractor inspection done to final out
|
Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Brian Scoles
|
|
|
Need a cover inspection for Orange Theory in Boise. If you have any questions please call Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- Seal ok- ok to insulate and cover hard lids only
|