Final | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Final | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- return air filter box needs insulated- reinspect when completed
|
Rough-in | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- lineset will finish from crawl on final to furnace
|
Rough-in | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
Rough-in | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- exhaust fans not hooked up- missing 1 exhaust fan in CAT room garage entrance no ducting- supply plenum in crawl needs insulated- left correction notice front window
|
Pressure Test | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|