Final | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Jeff Glynn
|
Pressure Test | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Jeff Glynn 20lb gas
|
Rough-in | 7/3/2017 | 7/5/2017 | 7/5/2017 | A | PART |
Brian Scoles
|
|
|
Inspection requested via web by Jeff Glynn- need to call in final inspection when done- need secondary drain ran out or wet switch installed
|
Pressure Test | 7/3/2017 | 7/5/2017 | 7/5/2017 | A | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Jeff Glynn- guage doesnt zero out on gas line- 5lb flue pass
|