Final | 9/6/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Brian Scoles
|
|
|
Please call an hour in advance if before 3pm, will be at the house at 3pm Phone #: ###-#### Inspection requested via web by Michael Adamson
|
Final | 9/4/2017 | 9/5/2017 | 9/5/2017 | P | PART |
Brian Scoles
|
|
|
Please call an hour before arrival. Inspection for 2 furnaces, one upstairs and one in the crawl. Phone #: ###-#### Inspection requested via web by Michael Adamson- need uv protection on lineset outside both units- need to insulate supply and return air plenums in crawl space- need CO detectors 1 upstair hallway and 1 downstair hallway
|
Conference | 7/30/2017 | 7/31/2017 | 7/31/2017 | A | PASS |
Brian Scoles
|
|
|
please call an hour before arrival Phone #: ###-#### Inspection requested via web by Michael Adamson- discussed condensate drains, supply/RA ducting, furnace location, linset and A/C locations, gas lines- will call rough in inspection when ready- 5lb flue 2nd floor pass
|
Conference | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | PART |
Brian Scoles
|
|
|
please call an hour before arrival Phone #: ###-#### Inspection requested via web by Michael Adamson- talked about furnace in closet- routing of condensate- rescheduling for next week to finish conversation
|