Permit Information
Permit NumberMEC17-02855
StatusFinaled
Name PAIGE MECHANICAL GROUP INC
Site Address 701 E BOISE AVE
Project Name 
Customer Number17.6731.22
ePlanReviewNo
Description
Addition: Hydronic Piping, Hydronic equipment, cooling tower, natural gas piping, condensate, lab gas, start up
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/26/20187/30/20187/30/2018PPASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok
Mec-Aging Inspection6/25/20186/25/20186/25/2018 NR
DetailsJack Reynolds
called PMG and Nick said they are almost done with the project and would call in a final when ready
Rough-in3/26/20183/27/20183/27/2018APASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass
Rough-in3/13/20183/13/20183/13/2018PFAIL
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - Gauge wouldn't zero out for gas piping in room 210
Pressure Test3/5/20183/5/20183/5/2018PPASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass for room 215
Rough-in3/4/20183/5/20183/5/2018AFAIL
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige
Rough-in3/1/20183/2/20183/2/2018APASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60 lb gas pass for piping under cabnits in room 212
Rough-in2/27/20182/28/20182/28/2018PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Nicholas Paige-60 lb gas test in room w 205 pass.
Rough-in2/22/20182/23/20182/23/2018PPASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass for piping under cabnits in south classrooms
Pressure Test2/21/20182/21/20182/21/2018APASS
DetailsChad Schwendiman
100lb hydronic pass, 60lb gas pass for piping to roof
Rough-in2/16/20182/20/20182/20/2018APART
DetailsChad Schwendiman
please call in advance for access and direction to work Phone #: ###-#### Inspection requested via web by Nicholas Paige - 20lb gas pass for gas piping into classrooms
Pressure Test1/16/20181/17/20181/17/2018APASS
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass for final loop in wall
Pressure Test1/15/20181/16/20181/16/2018APART
DetailsChad Schwendiman
Ryan is contact

Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass on 5 out of the 6 gas piping loops in the walls
Conference10/19/201710/20/201710/20/2017ADONE
DetailsBrian Scoles
go over gas piping tie in to existing 4"- ###-####- went over gas piping connection at meter location-