Conference | 9/28/2017 | 9/29/2017 | 9/29/2017 | A | DONE |
Brian Scoles
|
|
|
Completed work based on inspectors notes. Please complete out. Inspection requested via web by Andrea Grigsby- should have been final- corrections made
|
Final | 9/29/2017 | 9/29/2017 | 9/29/2017 | A | PASS |
Brian Scoles
|
|
|
Completed work based on inspectors notes. Please complete out. Inspection requested via web by Andrea Grigsby- corrections made
|
Final | 8/17/2017 | 8/23/2017 | 8/23/2017 | A | FAIL |
Brian Scoles
|
|
|
Call Donna ###-#### 30 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Andrea Grigsby- flexable flue needs grade, no sags in ducting- fuses in disconnect need to be readable- need to insulate supply and return air in garage, unconditioned space
|