Final | 10/30/2017 | 10/30/2017 | 10/30/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Final | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- need duct blasr completed- need to figure out where gas leak is coming from inside house- installer onsite looking into this
|
Pressure Test | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Brian Scoles
|
|
|
flue pressure only Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 5lb flue pass
|
Rough-in | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Pressure Test | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka-m20lb gas pass- 5lb flue fail guage at zero
|
Pressure Test | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- outside air needs metal ducting insulated- dryer vent ovaled out in ceiling, needs to maintain 4" round- insulation shield on B vent needs 1" clearance and no gaps in shield 2nd floor fitting and pipe- need insulation shield on B vent in garage- lineset needs ran- B vent 2nd floor chase needs plumber strap secured- left correction notice front entry window
|
Pressure Test | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- flue guage at zero- gas guage wont zero out
|