Final | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Brian Scoles
|
|
|
signed occupancy card
|
Final | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- gas line on roof needs supported to roof stands- need to look at R/A in northwest office prints show in room installed in hallway- temp occupancy ok no card onsite to sign
|
Final | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- need engineering to look into keynote 1 M1.0 and if main dampers need installed per drawings- per phone call from engineers ok to omit dampers and the way duct is ran is ok
|
Pressure Test | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- 60lb gas pass
|
Rough-in | 8/8/2017 | 8/11/2017 | 8/11/2017 | A | PART |
Brian Scoles
|
|
|
Cover Inspection Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- seal ok in bathrooms NW corner- ok to cover ceiling
|