Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Brian Scoles
|
|
|
|
Rough-in | 8/23/2017 | 8/24/2017 | 8/24/2017 | P | CANC |
Brian Scoles
|
|
|
We are going back to fix red tag items and then we will need this reinspected please make this a pm inspection and please call Eric to coordinate when on the way ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan- should have been final
|
Final | 8/16/2017 | 8/18/2017 | 8/18/2017 | P | FAIL |
Brian Scoles
|
|
|
Anytime after 11 please call home owner when you are on your way Phone #: ###-#### Inspection requested via web by Kristin Dolan- need uv protction on line set outside- need right size fuses in disconnect at A/C- need 24" wide access platform installed for access to furnace- 2nd drain needs to be ran within 6" of garage floor- need armor flex on copper in attic and rips fixed- gas shut off needs to be accessible since furnace moved to new location
|
Final | 8/10/2017 | 8/11/2017 | 8/11/2017 | P | NR |
Brian Scoles
|
|
|
Call ahead to homeowner please Phone #: ###-#### Inspection requested via web by Kristin Dolan- will reschedule per phone call
|