Final | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Ben Livingston
|
|
|
|
Pressure Test | 8/30/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Ben Livingston
|
|
|
NEED EARLY PM INSPECTION PLEASE. THEY HAVE TO HAVE HOT WATER RESTORED TO HOTEL BY 3PM. SITE CONTACT BILL. GAS PIPING TO NEW TANKLESS WATER HEATERS. Phone #: ###-#### Inspection requested via web by Chris Field 5lb flue x7
|
Pressure Test | 8/30/2017 | 8/31/2017 | 8/30/2017 | P | CANC |
Ben Livingston
|
|
|
NEED EARLY AM PLEASE. THEY HAVE TO HAVE HOT WATER RESTORED BY 3PM AT LATEST. SITE CONTACT: BILL. NEW GAS PIPING TO TANKLESS WATER HEATERS Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|
Pressure Test | 8/22/2017 | 8/23/2017 | 8/23/2017 | P | FAIL |
Ben Livingston
|
|
|
MECHANICAL PRESSURE TEST. *NOTE: AIR GAUGE IS ON THE ROOF FOR THIS** PLUMBER ON THIS JOB: MATTHEW, ###-#### WILL BE ON SITE AROUND 3PM IF YOU CAN ARRANGE A LATER INSPECTION IN THE DAY. THANKS Phone #: ###-#### Inspection requested via web by Chris Field per manufacturers instruction, flue pipe and combustion air pipe need to be 6"
|