Final | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Brian Scoles
|
|
|
Final contact Stan Lillquist ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty- final ok- airbalance ok- card signed
|
Final | 7/10/2018 | 7/11/2018 | 7/11/2018 | P | PART |
Brian Scoles
|
|
|
Contact Stan Lillquist ###-#### Temp Occupancy excluding Chemistry 123 and Biology 104 due to Fume Hoods not installed. Phone #: ###-#### Inspection requested via web by Dan Flaherty- TEMP OCCUPANCY OK- need to add expanded metal to exhaust fans on roof for safety precautions- needs to find mini split condensate drain and run to approved location- need to seal line set weather tight on minisplit on roof- temp occupancy ok for all building excluding chemistry 123 biology 104 and engineering room
|
Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Brian Scoles
|
|
|
Contact Stan Lillquist ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty- above grid R/I ok- ok for ceiling tiles
|
Rough-in | 7/6/2018 | 7/9/2018 | 7/9/2018 | P | PART |
Brian Scoles
|
|
|
Francisco is your contact. Thank you Phone #: ###-#### Inspection requested via web by Kim Adams- missing misc insulation and tape on flex- roof needs to be completed- recall in when ready- chemical hoods need o be insalled and hooked up waiing on general for glass and couners- no ceiling tiles yet until above grid inspection is done-
|
Final | 7/3/2018 | 7/6/2018 | 7/6/2018 | A | CANC |
Brian Scoles
|
|
|
Contact is Antonio ###-#### Looking for a temp Occupancy Phone #: ###-#### Inspection requested via web by Dan Flaherty- should have been R/I inspection for registers and above grid inspection
|
Rough-in | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | NR |
Brian Scoles
|
|
|
Contact is Antonio ###-#### Looking for a temp Occupancy Phone #: ###-#### Inspection requested via web by Dan Flaherty- still installing registers and tidying up flex above grid
|
Rough-in | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Brian Scoles
|
|
|
Rough in ; Antonio will be your contact. Thank you! Phone #: ###-#### Inspection requested via web by Kim Adams- insulation on duct ok- ok for ceiling grid all class rooms, gathering room and ok for sheetrock in bath rooms- misc duct to install look at when called in next time
|
Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | PART |
Brian Scoles
|
|
|
rough in for the north side. Antonio will be the contact ###-#### Phone #: ###-#### Inspection requested via web by Kim Adams- northside classrooms only seal on duct ok- ok to insulate classrooms only
|
Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PART |
Brian Scoles
|
|
|
rough in inspection for tomorrow afternoon for the South end. Antonio is your contact @ ###-####. Phone #: ###-#### Inspection requested via web by Kim Adams- south side classrooms seal on duct ok only- ok to insulate southside only- south bathrooms not ready will call in
|