Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz
|
Conference | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Brian Scoles
|
|
|
Duct blast witness tech will be there and ready around 9-9:30 Inspection requested via web by Konrad Swartz- duct blast pass both units
|
Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- need to witness duct blast on both units- need to rebalance both systems, both are to low and needs to have person who did it and street address on sheet- need to seal all ducting at furnace location- need to fire caulk around supply and R/A ducts in furnace closet- reinspect when ready
|
Rough-in | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz
|
Pressure Test | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- 20lb gas pass- 5lb flue X 2 pass
|
Pressure Test | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- gas test failed gauge at 10psi- east flue test fail gauge below 5psi- west flue pass
|
Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- need to fix all rips and tears on both linesets from outside to furnaces on armor flex- framingneeds completed in basement around 2 supply lines north bedrooms- left correction notice front door window
|