Final | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Jack Reynolds
|
|
|
line sets have UV protection and are supported- final ok
|
Final | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- SW linesets outside need UV protection and supported to wall
|
Rough-in | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- R/I cover for ceiling in SW office space ok
|
Rough-in | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Rough-in | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Ben Livingston
|
|
|
computer room tomorrow please. Phone #: ###-#### Inspection requested via web by Nicholas Paige relocated lineset for mini split in computeroom okay
|
Rough-in | 12/21/2017 | 12/22/2017 | 12/22/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- ok to cover hard lids for bathrooms- line sets in wall ok to cover
|
Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Brian Scoles
|
|
|
seal on duct ok- ok to insulate and install grid
|
Pressure Test | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas X2 from meter to tube heaters and units ok- need inert tape on penertrations thru wall at meter location- need shut off valve with in 6 feet of each appliance-
|
Rough-in | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- seal on main trunk and make up air duct in office space ok for insulation only- branch lines later
|