Final | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Jack Reynolds
|
|
|
Call Rich with any questions ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau - final ok - will sign occ when other mech permit is scheduled for an inspection. - Last phase of building which is Fedex will be on a different BLD
|
Rough-in | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PART |
Jack Reynolds
|
|
|
Rough in for cover phase 4 Phone #: ###-#### Inspection requested via web by Beka Hereau - phase 4 training room ceiling cover ok
|
Mec-Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 | | DONE |
Jack Reynolds
|
|
|
WIP last inspection for a final needed approval of the green report
|
Final | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | NR |
Jack Reynolds
|
|
|
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: 208-869-45 87 Inspection requested via web by Beka Hereau - green building needs to be reviewed by code offical for temp occ
|
Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Jack Reynolds
|
|
|
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: ###-#### Inspection requested via web by Beka Hereau - checked condensates in phase three one ducted split still needs condensate finished - a few locations at branch boxes need insulation finished - dryer duct going through roof was ok below roof line need to check termination on roof still - insulation of duct work ok - ceiling cover is ok just need to see a few locations above ceiling at temp occ inspection
|
Mec-Aging Inspection | 1/1/2019 | 1/1/2019 | 1/2/2019 | | PASS |
Jack Reynolds
|
|
|
-WIP -job is on last phase
|
Final | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PEND |
Jack Reynolds
|
|
|
Requesting a final inspection on Phase II. Please Contact Rich Beckstead if you have any questions. Phone #: ###-#### Inspection requested via web by Beka Hereau- need to see verification of exhaust and make up air system in truck bay is working
|
Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PART |
Jack Reynolds
|
|
|
Rough In for ceiling cover Phone #: ###-#### Inspection requested via web by Beka Hereau- kitcken ok for ceiling cover- captains office and sleeping room ok for ceiling cover- condensate still needs to be tied in and lineset insulation still needs finished- 2 ranges need some duct sealer finished
|
Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | CANC |
Jack Reynolds
|
|
|
Final Phone #: ###-#### >> Inspection requested via web by Beka Hereau Inspection cancelled from web by: Beka Hereau
|
Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Jack Reynolds
|
|
|
Rough In for cover Phase 2 Contact Tim ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- Duct insulation ok in phase 2
|
Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PART |
Jack Reynolds
|
|
|
Contact Rich Beckstead ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- phase 2 new addtion on west side duct seal ok ready for insulation,truck bay exhaust and make-up air duct ok- centeral location of building/kitcken exhaust through roof ok duct seal ok ready for insulation- talked with plumber about pressure tests he said he will get hydronics, gasline, and air on pressure and call in all at once
|