Permit Information
Permit NumberMEC17-04148
StatusFinaled
Name AMERICAN MECHANICAL
Site Address 2855 W LOCKHEED LN
Project NameBOI ARFF REMODEL / EXPANSION
Customer Number 
ePlanReviewNo
Description
Alteration: HVAC
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/30/20197/30/20197/30/2019PPASS
DetailsJack Reynolds
Call Rich with any questions ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau
- final ok
- will sign occ when other mech permit is scheduled for an inspection.
- Last phase of building which is Fedex will be on a different BLD
Rough-in5/23/20195/24/20195/24/2019APART
DetailsJack Reynolds
Rough in for cover phase 4 Phone #: ###-#### Inspection requested via web by Beka Hereau
- phase 4 training room ceiling cover ok
Mec-Aging Inspection5/8/20195/8/20195/8/2019 DONE
DetailsJack Reynolds
WIP
last inspection for a final needed approval of the green report
Final2/6/20192/6/20192/6/2019PNR
DetailsJack Reynolds
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: 208-869-45
87 Inspection requested via web by Beka Hereau
- green building needs to be reviewed by code offical for temp occ
Rough-in2/6/20192/6/20192/6/2019PPASS
DetailsJack Reynolds
The inspection is for a final on Phase III to Cover. Please contact Rich Beckstead ###-#### if you have any questions. Phone #: ###-#### Inspection requested via web by Beka Hereau
- checked condensates in phase three one ducted split still needs condensate finished
- a few locations at branch boxes need insulation finished
- dryer duct going through roof was ok below roof line need to check termination on roof still
- insulation of duct work ok
- ceiling cover is ok just need to see a few locations above ceiling at temp occ inspection
Mec-Aging Inspection1/1/20191/1/20191/2/2019 PASS
DetailsJack Reynolds
-WIP
-job is on last phase
Final10/2/201810/3/201810/3/2018APEND
DetailsJack Reynolds
Requesting a final inspection on Phase II. Please Contact Rich Beckstead if you have any questions. Phone #: ###-#### Inspection requested via web by Beka Hereau- need to see verification of exhaust and make up air system in truck bay is working
Rough-in9/13/20189/14/20189/14/2018APART
DetailsJack Reynolds
Rough In for ceiling cover Phone #: ###-#### Inspection requested via web by Beka Hereau- kitcken ok for ceiling cover- captains office and sleeping room ok for ceiling cover- condensate still needs to be tied in and lineset insulation still needs finished- 2 ranges need some duct sealer finished
Final8/13/20188/13/20188/13/2018PCANC
DetailsJack Reynolds
Final Phone #: ###-#### >> Inspection requested via web by Beka Hereau Inspection cancelled from web by: Beka Hereau
Rough-in7/18/20187/18/20187/18/2018PPART
DetailsJack Reynolds
Rough In for cover Phase 2
Contact Tim ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- Duct insulation ok in phase 2
Rough-in7/5/20187/6/20187/6/2018APART
DetailsJack Reynolds
Contact Rich Beckstead ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- phase 2 new addtion on west side duct seal ok ready for insulation,truck bay exhaust and make-up air duct ok- centeral location of building/kitcken exhaust through roof ok duct seal ok ready for insulation- talked with plumber about pressure tests he said he will get hydronics, gasline, and air on pressure and call in all at once