Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PART |
Brian Scoles
|
|
|
PLEASE MAKE FOR 10AM. BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok- need to figure out whats going on with other permit pulled mec18-01651 thats issued- need other mech(TML) inspection complete to final this permit out
|
Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- need to run hard pipe on hood thru appliance- need approved drawing of engineering room onsite- Brad will get it
|
Final | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PART |
Brian Scoles
|
|
|
temp occupancy ok excluding biology 104 and chemistry 123 where hoods set needs gas finished and engineering room NE corner
|
Final | 7/6/2018 | 7/9/2018 | 7/9/2018 | P | PART |
Brian Scoles
|
|
|
JOB CONTACT - BRAD ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- need to secure gas piping on roof- need to add hanger to gas line- need all hoods set and gas piping completed- all class rooms ok- plumbing vent needs to be 10' away or 3' higher than RTU intake- recall in inspection when ready
|
Pressure Test | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PART |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass SW corner and both branch lines south side and north side class rooms- need to test roof to where enters building sw corner
|
Pressure Test | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PART |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 20lb gas pass rooms 102, 105,106 and 109- ok to cover-
|
Pressure Test | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PART |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 20lb gas pass in classrooms 120, 121 and 124- piping and supports all good
|
Pressure Test | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass from meter over existing building- approx 250' of 2 inch pipe-
|