Final | 12/3/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Final | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak armaflex needs uv tape, need to make where lineset enters foundation rodent proof
|
Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak need to finish condencer connection, and protection post by furnace and w/h
|
Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Troy James
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak may need transfer grille at dryer closet, verify at final
|
Pressure Test | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 20# gas test and 5# flue
|