Mec-Aging Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | | DONE |
Troy James
|
|
|
|
Final | 12/14/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Troy James
|
|
|
|
Mec-Aging Inspection | 9/14/2018 | 9/14/2018 | 9/14/2018 | | PART |
Troy James
|
|
|
wip
|
Mec-Aging Inspection | 6/15/2018 | 6/15/2018 | 6/15/2018 | | PEND |
Troy James
|
|
|
work still in progress
|
Pressure Test | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Brian Scoles
|
|
|
Please call Mark Rowley to coordinate the inspection. Thank you Phone #: ###-#### Inspection requested via web by JASON MEANS- 130lb gas test pass from meter location to Boiler locations
|