Final | 1/15/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Jasmin Godina
|
Rough-in | 10/27/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Brian Scoles
|
|
|
fireplace R/I ok
|
Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | FAIL |
Brian Scoles
|
|
|
builder finishing framing in dropped ceiling- insulation needs to meet clearance to combustible requirements on b vent- its laying/touching pipe
|
Rough-in | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Jasmin Godina- meeting with builder at 2ish to block off framing so insualtion that could possibly get down on top of fireplace
|