Final | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Troy James
|
|
|
Will Phone #: ###-####
|
Final | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Chad Schwendiman
|
|
|
Will Phone #: ###-####
|
Rough-in | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Brian Scoles
|
|
|
Will Phone #: ###-####-
|
Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | CANC |
Brian Scoles
|
|
|
Will ###-####//See Permit Desk regarding payment
|
Rough-in | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PEND |
Brian Scoles
|
|
|
Will Phone #: ###-####- need approved resubmitted Manual J onsite to do inspection- i rescheduled for 10/26/17 AM inspection-
|
Pressure Test | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PASS |
Brian Scoles
|
|
|
fire pit only - line set going in before final - Will Phone #: ###-####- 60lb gas pass- 20lb gas pass and under ground to firepit
|
Rough-in | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | CANC |
Brian Scoles
|
|
|
Will Phone #: ###-####- should have been conference- talked about issues on correction notice- need to resubmit manual J for new duct routing as installed
|
Pressure Test | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PART |
Brian Scoles
|
|
|
Will Phone #: ###-####- 60lb gas pass- 20lb gas pass inside house- need to pressure test outdoor underground to firepit
|
Pressure Test | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | CANC |
Brian Scoles
|
|
|
Will Phone #: ###-####- should have been conference
|
Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | NR |
Brian Scoles
|
|
|
Will Phone #: ###-####- R/I incomplete- 6" fresh air can not come from roof- crawl incomplete- duct 2nd floor R/A not ran like manual J shows- need to insulate bare supply metal in attic- linesets need ran to both units- gas regulator locations?/- 18 to 16 reducer needs installed in shaft- dryer vent to long need to address- left correction notice front entry window
|