Final | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Final | 2/5/2018 | 2/5/2018 | 2/5/2018 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Rough-in | 11/6/2017 | 11/8/2017 | 11/8/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- need to insulate supply plenum in crawl- need to run 8" flex for o fresh air to R/A plenum- left notice front entry
|
Pressure Test | 11/6/2017 | 11/8/2017 | 11/8/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|