Final | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Final | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | FAIL |
Eric Strole
|
|
|
Garage code #0324 Phone #: ###-#### Inspection requested via web by Debbie Marino-The auxiliary drain shall drain to a conspicuous location or install a wet switch.
|
Rough-in | 11/15/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | NR |
Brian Scoles
|
|
|
Brian please meet Shannon at job at 130 today Phone #: ###-#### Inspection requested via web by dannyel chaloupka- erv needs routing redone- need intake for furnace from outside- combustion air needs to come from outside- Zach knows per conversation onsite- reinspection needed
|
Pressure Test | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Brian Scoles
|
|
|
Brian please meet Shannon at job at 130 today Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass- 5lb flue pass
|
Rough-in | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 8" fresh air needs ran, dont see it- need combustion air for furnace room eith from outside or communicate with garage- flue pressure at 4 psi- need ladder to access ducting for ERV unit, dont see where 2 6" ducts are beibg taken from living space per manufactures install- need to schedule time to meet for this- left corrction notice front window
|
Pressure Test | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass- 5lb flue fail gauge at 4psi
|