Final | 2/7/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Teresa Costello
|
Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Teresa Costello- R/I ok
|
Final | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | FAIL |
Brian Scoles
|
|
|
Ladder should be dropped off and available for inspection to be completed. Phone #: ###-#### Inspection requested via web by Teresa Costello- b vent at roof needs 1" clearance to combustibles- 6" fresh air needs bare metal insulated and flappers on register need to be installed- need air balance and duct blast reports onsite- need to add misc duct and range hood to permit and pay fees- CO detectors??- exhaust fans need hooed up???- Dryer vent???- left correction notice front window
|
Final | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Teresa Costello- need ladder provided to gain entrance into attic from outside of house
|