Final | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Brian Scoles
|
|
|
Re-inspection Phone #: ###-#### Inspection requested via web by Devony Bullard- final ok
|
Final | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- single wall flue pipe needs 6" clearance to primary and 2nd pvc drains- ducr blast test needs witnessed- need make up air to dryer closet- left correction notice on furnace
|
Pressure Test | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
Rough-in | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Alan Hauser
|
|
|
|