Final | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- card signed
|
Final | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- need 3 wet switches installed on secondsry drains- need uv protection on all 3 units outside on armaflex
|
Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Brian Scoles
|
|
|
Ceiling cover inspection Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- ceiling ok to cover and install ceiling tiles
|
Rough-in | 11/16/2017 | 11/20/2017 | 11/20/2017 | A | PART |
Alan Hauser
|
|
|
duct ok, recall when grid is in
|