Final | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
Final | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS- need other mech final inspections done before can close this permit out-
|
Final | 12/8/2017 | 12/8/2017 | 12/8/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS- gas line on roof needs to be secured to all supports
|
Pressure Test | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS- 20lb gas pass whle system- gas piping on roof needs secured to hanger on roof by final
|
Pressure Test | 11/20/2017 | 11/20/2017 | 11/20/2017 | A | PART |
Brian Scoles
|
|
|
Pressure test for gas piping in wall only Phone #: ###-#### Inspection requested via web by MICHAEL BYERS- 20lb gas pass from meter to roof- ok to cover exterior walls only- need inert tape at meter thru wall- pressure test whole system when roof is installed and gas piping finished
|