Final | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Brian Scoles
|
|
|
FINAL OK- card signed
|
Final | 2/5/2018 | 2/5/2018 | 2/5/2018 | A | PART |
Brian Scoles
|
|
|
LasikPlus - final inspection requested. Chris Jacobson is job lead ###-####. Call him with any questions. Phone #: ###-#### Inspection requested via web by Jess Wigley- Temp occupancy ok- will final out when get other Mech contractor permit straightened out
|
Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 | A | PASS |
Brian Scoles
|
|
|
LasikPlus TI - Ceiling cover inspection requested. Job lead is Chris Jacobson ###-#### Phone #: ###-#### Inspection requested via web by Jess Wigley- R/I ok- duct sealing and flex to registers ok- ok for ceiling tiles-
|
Rough-in | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Brian Scoles
|
|
|
LasikPlus TI - Cover inspection for procedure room before sheet rock is installed. Job lead is Chris Jacobson ###-####. Phone #: ###-#### Inspection requested via web by Jess Wigley- procedure room ok to cover only- insulation and ducting all good
|
Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PART |
Brian Scoles
|
|
|
LasikPlus TI - cover inspection requested for duct in trusses. Job lead is Chris Jacobson ###-#### Phone #: ###-#### Inspection requested via web by Jess Wigley- insulation and seal ok in procedure room ducting- ok for hard lid this room only-
|
Rough-in | 1/11/2018 | 1/12/2018 | 1/12/2018 | A | PART |
Brian Scoles
|
|
|
Partial ceiling inspection to inspect ducting and insulation prior to ceiling cover finish. Job lead is Chris Jacobson ###-#### Phone #: ###-#### Inspection requested via web by Jess Wigley- seal on ducting in Procedure room ok- ok for insulation this room only- fix vapor barrier at ceiling RA plenum around ehaust and make up air duct- inspection needed for rest building
|
Conference | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Brian Scoles
|
|
|
Conference regarding open plenums Job lead is Chris Jacobson ###-####. Phone #: ###-#### Inspection requested via web by Jess Wigley- went over plenum rated material- PVC being replaced with cast iron- need verification that fiber optic cables is plenum rated-
|