Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok need RM mechanical permit to be finaled before full final
|
Rough-in | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Jack Reynolds
|
|
|
R/I on shell and core gas piping on roof ok
|
Pressure Test | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60 lb gas pressure test on all 6 gas runs on to the roof ok
|