Final | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard
|
Final | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- flue on furnave need 1/4" grade to furnace has trap at wye branch- need insulation shield installed garage ceiling and maintain 1" clearance to combustibles and trim ring installed on b vent after framing is completed
|
Pressure Test | 2/9/2018 | 2/12/2018 | 2/9/2018 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Pressure Test | 2/9/2018 | 2/12/2018 | 2/9/2018 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Brian Scoles
|
|
|
If you could call Vance when you get there that would be great. Thank you! Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | FAIL |
Brian Scoles
|
|
|
If you could please call Vance when you get there that would be great thank you! Phone #: ###-#### Inspection requested via web by Devony Bullard- used wrong tape on dryer vent connections- need to support flexable duct per manufacture install- went over with Vance onsite- reinspect when corrected
|
Pressure Test | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Brian Scoles
|
|
|
If you could call Vance when you get there that would be great. thank you Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
Rough-in | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Alan Hauser
|
|
|
|