Final | 4/20/2018 | 4/23/2018 | 4/23/2018 | A | PASS |
Brian Scoles
|
|
|
###-####- final ok- co detection and air balance ok- range hood, ducting, seal, and air balance ok- card signed
|
Final | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- air balance all good- CO detection system all good- general contractor has call into engineer about duct type if air balance needs to be done on this not noted so just checking- GC will call me when he gets answers- final will be granted after this conformation
|
Final | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- need air balance report onsite- needs range hood manufacture installation instruction onsite
|
Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- need air balance report onsite or sent to me by email- M2.0 key note 8 radon das needs gooseneckm installed on roof- need to get with electric contractor for bay door activation on exhaust fan- temp occ ok
|
Rough-in | 3/15/2018 | 3/19/2018 | 3/19/2018 | A | PART |
Brian Scoles
|
|
|
Cover inspection Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- R/I in office side ok for cover- need condensate drain hooked up- need vehicle bay finished
|
Rough-in | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | PART |
Brian Scoles
|
|
|
Cover inspection for hard lids. Phone #: ###-#### Inspection requested via web by RaChelle Frisbee- hard lid ducting and seal on duct ok- registers ok- ok to cover hard lids only
|
Rough-in | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | PART |
Alan Hauser
|
|
|
Underground rough in. ok for radon piping
|