Final | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok
|
Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- condensate upstairs is finished- R/I ok
|
Rough-in | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PART |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 1st floor condensate ok ready for cover- 2nd floor condensate 90% done only one unit left to run condensate, unit in SE hallway next to stairs - brian is waiting on sheetrock above ceiling to support pipe on wall
|
Pressure Test | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 20lb pressure test from meter to roof and across roof to all units ok
|
Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PART |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 1st floor still needs five units on the eastside finished- 2nd floor still needs one unit on the south east hallway finished
|
Pressure Test | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Chad Schwendiman
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 20lb gas pass from meter up to roof
|
Pressure Test | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Chad Schwendiman
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 20lb gas pass for stub out in exterior wall
|