Final | 8/2/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Jack Reynolds
|
|
|
call in advance for access Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok- card signed
|
Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 2nd floor R/I ok
|
Rough-in | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 1 st floor R/I ok returns are done and insulated- linesets are done and insulated- ok for ceiling tile
|
Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 2nd floor stairwell NW corner hardlid ok for cover- downstairs 95% done just need to finish one return tie in and finish insulating returns- a few linesets on 1st floor need insulation finished
|
Rough-in | 5/2/2018 | 5/4/2018 | 5/4/2018 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 1st floor R/I- hards lids ok for cover 1st floor
|
Rough-in | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PART |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - Okay to insulate duct work in shaft and on the 1st floor
|
Rough-in | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- undefground piping ok to cover- look at access door in elevator shaft at final for under ground duct
|