Final | 1/31/2018 | 2/6/2018 | 2/6/2018 | A | PASS |
Brian Scoles
|
|
|
Please call installer when in route to home at ###-#### he will be there between 8am-10am to meet with inspector to complete flue pressure test and final mechanical. Phone #: ###-#### Inspection requested via web by Carolyn Rudd- furnace AC CO ok
|
Pressure Test | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Brian Scoles
|
|
|
Please call installer when in route to home at ###-#### he will be there between 8am-10am to meet with inspector to complete flue pressure test and final mechanical. Phone #: ###-#### Inspection requested via web by Carolyn Rudd- 5lb flue test pass
|