Final | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Eric Strole
|
|
|
Mike ###-#### Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Final | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-No air balance report on site on site.
|
Rough-in | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | FAIL |
Eric Strole
|
|
|
Other half - see previous notes - crawl inspection. Phone #: ###-#### Inspection requested via web by Bryan Palmer-No manual-j on site.
|
Pressure Test | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Eric Strole
|
|
|
Attention Eric Please call Mike ###-#### 1/2 hr. before inspection. Crawl not completed due to mold issues. Phone #: ###-#### Inspection requested via web by Bryan Palmer-20 lb gas test pass
|
Rough-in | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PART |
Eric Strole
|
|
|
Attention Eric Please call Mike ###-#### 1/2 hr. before inspection. Crawl not completed due to mold issues. Phone #: ###-#### Inspection requested via web by Bryan Palmer-Crawlspace has a mold issue that needs addressed before mech is crawled. Inwall r/i ok. Spoke with bld inspector and ok to insulate walls only till mech r/i is complete and inspected.
|