Card not on site to sign | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Brian Scoles
|
|
|
card not onsite to sign
|
Final | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Brian Scoles
|
|
|
PleAse call 1 hr in advance Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok- airbalance report all good
|
Final | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PART |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - Temporary occupancy okay, need balance report for hoods
|
Rough-in | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Chad Schwendiman
|
|
|
cover and second layer of grease rap inspection for tomorrow January 24th am Phone #: ###-#### Inspection requested via web by Nicholas Paige - Okay to cover grid ceilings
|
Rough-in | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Brian Scoles
|
|
|
Grease Duct Phone #: ###-#### Inspection requested via web by Nicholas Paige- first layer fire wrap on both duct ok- ok for second layer fire wrap
|
Rough-in | 1/15/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Brian Scoles
|
|
|
Grease duct Phone #: ###-#### Inspection requested via web by Nicholas Paige- weld on both ducts ok- ok for 1st layer of fire wrap
|
Rough-in | 1/11/2018 | 1/12/2018 | 1/12/2018 | A | FAIL |
Brian Scoles
|
|
|
Grease duct inpection Phone #: ###-#### Inspection requested via web by Nicholas Paige- need to fix all pinholes and reinspect when completed
|
Rough-in | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige duct seal ok to insulate
|
Rough-in | 12/15/2017 | 12/18/2017 | 12/18/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- seal on duct for bathroom and hallway ok- ok to insulate and cover hard lid ceilings only
|