Final | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK - need to tether movable cooking equipment under hood to the wall
|
Pressure Test | 1/5/2018 | 1/8/2018 | 1/5/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by PATTY KIRK Inspection cancelled from web by: PATTY KIRK
|
Pressure Test | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Brian Scoles
|
|
|
60lb gas pass whole system
|
Pressure Test | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK- gauge at 3 psi- need to attach piping to all roof stands- please have contractor meet me onsite for next inspection
|
Pressure Test | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PART |
Alan Hauser
|
|
|
underground piping ok, 60# test ok
|
Conference | 12/19/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Alan Hauser
|
|
|
gas piping route appears ok
|