Final | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard
|
Rough-in | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Ben Livingston
|
|
|
Re-inspection Phone #: ###-#### Inspection requested via web by Devony Bullard
|
Rough-in | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | FAIL |
Chad Schwendiman
|
|
|
we passed the pressure test on this job but failed the manual J. Phone #: ###-#### Inspection requested via web by Devony Bullard- 1) Need approved copy of manaul J on site 2) Missing nail plates on dryer duct, and lineset 3) Need a ladder on site to access equipment in attic 4) Missing fresh air to return plenum 5) Need a solid floor walk way from attic access to equipment platform thats not less then 24" wide
|
Rough-in | 12/21/2017 | 12/26/2017 | 12/26/2017 | A | FAIL |
Ben Livingston
|
|
|
Inspection requested via web by Devony Bullard need approved manual j for roughin inspection and ladder
|
Pressure Test | 12/26/2017 | 12/26/2017 | 12/26/2017 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Devony Bullard 20lb gas
|