Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
Final | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | FAIL |
Ben Livingston
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak fireplace not complete
|
Final | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak flex tubing not approve material for condensate piping, need balance report, and blast test
|
Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | P | PART |
Ben Livingston
|
|
|
FIRE PL Phone #: ###-#### Inspection requested via web by Oleg Chervak fireplace okay
|
Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak fresh air to return plenum
|
Pressure Test | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 20lb gas, 5lbflue x2
|