Final | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 20lb gas, fireplace, and roughin
|
Rough-in | 1/5/2018 | 1/8/2018 | 1/8/2018 | P | FAIL |
Ben Livingston
|
|
|
Oleg Phone #: ###-#### 6" fresh air to return plenum, bvent needs insulation shield
|