Final | 12/7/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Troy James
|
|
|
|
Mec-Aging Inspection | 10/8/2018 | 10/8/2018 | 10/8/2018 | | DONE |
Troy James
|
|
|
WIP
|
Final | 4/12/2018 | 4/16/2018 | 4/16/2018 | A | CANC |
Eric Strole
|
|
|
|
Final | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | PART |
Eric Strole
|
|
|
Final for natural gas piping system Phone #: ###-#### Inspection requested via web by JASON MEANS-R/I pass
|
Pressure Test | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PART |
Eric Strole
|
|
|
Please call Mark Rowley to coordinate the inspection. Thank you Phone #: ###-#### Inspection requested via web by JASON MEANS-150 lb gas test pass. Need to support 8" gas piping every 10'.
|
Pressure Test | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PART |
Eric Strole
|
|
|
Please coordinate the inspection with Mark Rowley. Thank you. Phone #: ###-#### Inspection requested via web by JASON MEANS-60 lb gas test on temporary 1 1/2" line into partial section of 8" for temporary heat pass.
|