Final | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
Final | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak insulate outside air duct unit 102 and 104 plug drain pan hole unit 103
turn down secondary drain pan line at exterior
|
Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I ok- correction made
|
Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PART |
Brian Scoles
|
|
|
Oleg Phone #: ###-####- need supply register in kitchen B units- range hood duct or ventless??
|