Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- fireplace final ok
|
Final | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- fireplace needs put together
|
Rough-in | 1/11/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
Rough-in | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- fireplace draft stop 2nd floor has firecaulk missing at ceiling
|