Final | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Final | 5/1/2018 | 5/3/2018 | 5/3/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer - A/C not installed, Lineset not connected, No air balance report onsite
|
Rough-in | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer
|
Rough-in | 1/25/2018 | 1/29/2018 | 1/29/2018 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer need approved resubmitted manual j on site for inspection
|
Pressure Test | 1/23/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-20 lb gas test pass
|
Rough-in | 1/23/2018 | 1/25/2018 | 1/25/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Bryan Palmer-Rough-in is not per the approved manual-j.
|