Final | 7/6/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- final ok
|
Final | 7/5/2018 | 7/5/2018 | 7/5/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- water heater flue needs 6" clearance to combustibles- need make up air for dry closet installed
|
Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Brian Scoles
|
|
|
If you could call Vance when you arrive that would be great thank you! Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
Rough-in | 1/12/2018 | 1/16/2018 | 1/16/2018 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- need approved manual J onsite
|