Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberMEC18-00249
StatusFinaled
Name KMD MECHANICAL
Site Address 7609 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Install HVAC system, Grilles, Insulation, Registers, Ductwork, Controls.Ect.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/7/20186/7/20186/7/2018PPASS
DetailsBrian Scoles
final ok
Final6/5/20186/6/20186/6/2018APART
DetailsBrian Scoles
Can I please get a final on Chow for AM. please. If you have any questions please contact Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- Final ok- will final out this permit when other mech contractor pulls permit for cooler/freezer install- TEMP occupancy ok
Conference6/4/20186/5/20186/5/2018ADONE
DetailsJack Reynolds
I will need a conference at 9 am for Chow with Karl ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin
Final4/20/20184/20/20184/20/2018PPART
DetailsBrian Scoles
Final inspection needed for today PM. If you have questions please contact Karl at ###-####. I have sent the air balance report to Brian Scoles thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- air balance ok on equipment- need all equipment set under hoods prepping floors for flooring- need equipment tethered when in place- need other mech contractor inspection completed too
Rough-in4/17/20184/18/20184/18/2018APASS
DetailsBrian Scoles
Cover inspection needed for Am on April 18th, 2018. If you have any questions you may contact Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- seal ok- ok for ceiling tiles
Rough-in4/16/20184/16/20184/16/2018PFAIL
DetailsBrian Scoles
Ceiling grid inspection needed for PM today.If you have any questions please call ###-#### Karl Hestekin thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- need to seal all supply r/a ducting above all grid area by all 3 hoods, missing joints and some are just partially done
Rough-in4/10/20184/10/20184/10/2018PPASS
DetailsBrian Scoles
Karl at ###-####-1st layer fire wrap thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- 2nd layer fire wrap ok- ok for cover
Rough-in4/6/20184/6/20184/6/2018APASS
DetailsBrian Scoles
Grease duct weld inspection call Rob Judy before going Phone #: ###-#### Inspection requested via web by Karl Hestekin- R/I on HVAC duct ok and seal ok- grease duct install ok- hangers ok- ok for first layer of grease duct wrap
Rough-in3/29/20183/30/20183/30/2018PCANC
DetailsBrian Scoles
Grease duct inspection for Friday PM. If you have questions contact Karl at ###-####, Or you can contact Rob at ###-#### thank you. Phone #: ###-#### >> Inspection requested via web by Karl Hestekin Inspection cancelled from web by: Karl Hestekin
Rough-in3/28/20183/28/20183/28/2018PPART
DetailsBrian Scoles
Grease duct inspection needed for PM thank you Call Karl with any questions you might have. Phone #: ###-#### Inspection requested via web by Karl Hestekin- need installation manual for grease duct installed- need hangers all roof penetrations- need cleanout for west side grease duct