Final | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Ben Livingston
|
|
|
Ready for final. Vents are moved and balance report will be sent shortly Phone #: ###-#### Inspection requested via web by Drew Tverdy
|
Final | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | FAIL |
Ben Livingston
|
|
|
There are few vents that are within 10 feet of make up air but the hood is balanced, just waiting on the report. Was shooting for a temporary final so they can open for the weekend if everything else will be finaled. Phone #: ###-#### Inspection requested via web by Drew Tverdy vents within 10' of MAU need to be 3' above inlet, need report for final
|
Rough-in | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PASS |
Chad Schwendiman
|
|
|
Light test on duct to hood connection so we can wrap. Phone #: ###-#### Inspection requested via web by Drew Tverdy
|
Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PART |
Ben Livingston
|
|
|
Light test on two 10 foot grease ducts. Will be ready by 3 p.m. Phone #: ###-#### Inspection requested via web by Drew Tverdy 2 10' 14x14 grease duct pass
|